By the Scott Niehaus Air Conditioning & Heating team · Updated October 6, 2026
A change-out replaces your whole AC and heating system. With Scott Niehaus AC it includes the equipment, installation to Florida Building Code, every required permit priced into the estimate, a 1-year parts and labor warranty from us, and a 10-year manufacturer parts warranty on registration.
The short answer
- Free on-site estimate with flat-rate pricing and no hidden add-ons.
- Goodman equipment.
- Permits pulled by us, with permit costs included in the estimate.
- 1-year parts & labor from us + 10-year manufacturer parts warranty on registration.
When is a change-out the right call?
When the system is past 12–15 years, runs on a phased-out refrigerant, has a major compressor motor failure, or keeps running up costly repair bills.
What happens on the estimate visit?
A free on-site analysis followed by a formal proposal with transparent flat-rate pricing and no hidden add-ons.
Who handles the permit?
We do. Scott Niehaus Air Conditioning and Heating, Inc. pulls all required municipal and county mechanical permits for HVAC system installations in accordance with Florida Building Code. Permit costs are included in project estimates.
What warranties come with it?
A 1-year parts and labor warranty directly from Scott Niehaus AC, plus a 10-year manufacturer parts warranty once the equipment is registered with the manufacturer.
What goes wrong with low-bid change-outs?
Skipped permits, add-on charges that appear after the quote, and equipment installed without registration so the long manufacturer warranty never starts. Ask any contractor whether each of those is in writing.
How Scott Niehaus AC handles this
- 100% permit compliance on all full system change-outs.
- Licensed Florida HVAC contractor, CAC057109, with EPA Section 608 certified technicians.
Common questions
Are permit fees extra?
No. Permit costs are included in our project estimates.
Is the replacement estimate free?
Yes. Change-out estimates are a free on-site analysis with a formal proposal.
Sources
- The Florida Building Code is adopted and maintained by the Florida Building Commission. Florida Building Commission — floridabuilding.org
